Allée de baies dans un datacenter DC2SCALE
AI clusters

Your AI cluster in France, from a few racks to several megawatts

You bring the GPUs. We bring the power, the cooling, the security and the teams who stay on site. First tranche delivered in 4 to 8 weeks.

How much does your cluster draw?

NVIDIA
AMD
Ancillary racks: network, storage, CPU nodes
  • Mellanox Quantum-X800 InfiniBand Counted per rack, 15 kW
  • Mellanox Spectrum-X Ethernet Counted per rack, 12 kW
  • Baie stockage Counted per rack, 8 kW
  • Baie réseau et management Counted per rack, 6 kW
  • Baie nœuds CPU Counted per rack, 12 kW
Other hardware

Your configuration

Pick a hardware type to start.

IT power

per rack at most

racks

Configure your cluster

In four figures

Density

128 kW per rack: a routine case for us, not a ceiling

Lead time

4 to 8 weeks for a first tranche up to 1 MW

Energy

1.35 PUE contractually capped

Answer

48 h working hours for a costed answer from an engineer

Density

One GB300 rack draws as much as ten classic colocation racks

Rangée de baies haute densité dans un datacenter DC2SCALE
The problem

This is no longer about floor space

A colocation room fills up when the space runs out. A cluster room fills up when the power runs out, often while half empty.

Our answer

Rooms built for power density

128 kW per rack is routine for us. Power distribution and cooling are sized for it from the start, not retrofitted.

Liquid

A loop that follows your hardware

Rear-door, direct-to-chip, immersion: the architecture is decided with you before signing.

Energy

You pay for your consumption, not for our efficiency

Spot

Indexed on the market

Your bill follows the market, the following month

Electricity is rebilled at the market spot price plus market. No fixed three-year rate that keeps you paying for a peak that is long gone.

1.35

PUE cap

Beyond that, it is on us

Datacenter overhead is contractually capped at 1.35. An operator that cools badly does not bill you for it.

MW

What you reserve

Power, not a flat rate

The contract covers megawatts made available at all times. Energy consumed is rebilled separately, on meter readings.

Lead times

From first description to power-on

Illustration d'une sélection en ligne
1.

You describe your hardware

The configurator turns your fleet into power, density and rack count. Five minutes, no appointment.

Illustration d'un message reçu
2.

An engineer calls you back

Within 48 working hours. We tell you what is available, where, and by when.

Illustration d'une mise en service
3.

You deploy

400 kW to 1 MW in 4 to 8 weeks. 1 to 3 MW in 3 to 4 months. Your teams get access from delivery.

High density

What it looks like when a customer really pushes the power

No middleman

You talk to the people who hold the breakers

We operate what we sell: the capacity is ours, so are the teams. An estimate without an NDA, a file treated as a file, an engineer who answers within 48 working hours.

Supervision des installations par une équipe DC2SCALE
Your cluster

Tell us what you are deploying

Five minutes in the configurator is enough to know what it means in power, racks and budget. An engineer then calls you back with a date.

Équipements de datacenter chargés pour livraison sur site